Gasboy Site Controller II CPU Manuale Utente Pagina 16

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 26
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 15
Upgrading Installing a New Memory Board
Page 12 MDE-4504 Site Controller II CPU/Memory Board/Program Upgrade Instructions · August 2005
Jumpers
Switches
Test Points
6 Install the new memory board into the base of the Site Controller using the Phillips screws
removed from the base.
7 Install the new CPU board in the Site Controller, and secure the board with the Phillips screws
previously removed and reconnect cables.
8 Install the new D-site chip in the U36 socket on the CPU Board. Be careful to place the D-site
chip in the proper position, and do not bend any pins.
Vedere la pagina 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 25 26

Commenti su questo manuale

Nessun commento